Dry dock
The dry-dock project: specification, yard quotes, budget and progress.
The dry-dock project: specification, yard quotes, budget and progress.
Module key: drydock. Accent colour: #d6d3d1 on dark, #57534e for accent text in the light theme (from @pruva/brand/tokens; see Module accents).
Pages
| Page | Path in the app | What it shows |
|---|---|---|
| Dry-dock project | /app/drydock | Docks by status, the next docking per vessel from its special survey date, and budget against actual. Each dock opens its specification (PMS jobs and yard items), the yard quotes and award, change orders and progress in the yard. |
| Dock history | /app/drydock/history | Closed docks per vessel with the yard, days in dock, items done and deferred, and budget against actual from the docking report. |
| Integrations | /app/integrations/drydock | The connectors this module reads from, with status, last sync and any problem to fix. |
Each dock opens /app/drydock/[id]: the specification (class jobs and yard items), the yard quotes, the award, change orders and progress. Completing a specification line that points at a job is Mark done on that job card. The next docking is planned from the special-survey year only. Intermediate dockings are not modelled.
Connectors
Every connector is a mock in this build. The demo reads generated data and makes no outside calls. Verify each provider before launch.
- Yard portal (
yard-portal): Yard quotes and progress reports for the dry-dock specification. Mock in this build. - Class survey planner (
class-survey-planner): Survey windows from the class society to plan the docking. Mock in this build.
See Connections for what each one will need.
Actions that need publish
These buttons need the publish level on this module. AI agents can never hold publish, so they cannot press them.
| Action | Key | What it does |
|---|---|---|
| Award a dry dock | drydock.award | The button is Award, one per yard quote. It awards the dock and sets the budget from that quote. The quotes are calculated in the app. No yard is contacted. |
| Approve a change order | drydock.change_order | The button is Approve a change order, and only while the dock is in the yard. It records the text and a USD amount. The actual cost adds these amounts to the awarded quote. |
Price
Dry dock is a Pro module: it takes one Pro slot on Operations or Professional, and is in Complete.
| Plan | Per vessel per year |
|---|---|
| Operations (4 Pro) | $6,995 per vessel per year |
| Professional (8 Pro) | $12,240 per vessel per year |
| Complete (all 13 Pro) | $19,900 per vessel per year |
A 10% deposit opens a 1-month trial, then billed annually per vessel. 3-year contract. You can leave in year 1. The deposit is not refunded. No refunds after the trial for the year already started; cancel renewal any time.
Also in the packs: Tanker compliance, Offshore & gas carriers, Ship manager's office.
Solves: Yard quotes compared by hand · Dry-dock budget overruns · Specification items forgotten.
- Dry-dock specification
- Yard quotes side by side
- Budget against cost
- Progress per job